ISO 29910-5-6-2 Process Products
ISO 29910-5-6-2 Process Products
Process Documents
Statement of Work (SOW)
Statement of Work (SOW)
Project Plan
Project Plan
- PM.1.2: Define Delivery Instructions
- PM.1.3: Define SBS
- PM.1.4: Define Milestones
- PM.1.5: Define Tasks
- PM.1.6: Estimate
- PM.1.7: Identify Resources
- PM.1.8: Define WT
- PM.1.9: Schedule Tasks
- PM.1.10: Estimate Cost
- PM.1.11: Identify Risk Management
- PM.1.12: Identify Disposal Approach
- PM.1.13: Identify CM Strategy
- PM.1.14: Define Scope
- PM.1.15: Integrate PP
- PM.1.16: Verify PP
- PM.1.17: PP Acceptance
- PM.1.19: Assign Tasks
- PM.2.4: Conduct STK Meetings
- SR.1.1: Revise Project Plan
Data Model
Data Model
Stakeholders Requirement Specifications (StRS)
Stakeholders Requirement Specifications (StRS)
System Design Document (SDD)
System Design Document (SDD)
Systems Engineering Management Plan (SEMP)
Systems Engineering Management Plan (SEMP)
System Requirements Specifications (SysRS)
System Requirements Specifications (SysRS)
System Elements Requirements Specifications (SERS)
System Element Requirements Specifications (SERS)
Change Request
Change Request
IVV Plan
IVV Plan
IVV Procedures
IVV Procedures
Product Acceptance Record
Product Acceptance Record
- SR.5.4: Validate System
- SR.6.1: Review Product
- SR.6.4: V&V Maintenance and Training
- PM.4.1: Formalize Completion
- SR.6.6: Transition to Manufacturing and support
Purchase Order
Purchase Order
Traceability Matrix
Traceability Matrix
System User Manual
System User Manual
System Operation Guide
System Operation Guide
System Maintenance Document
System Maintenance Document
System Training Specifications
System Training Specifications
Process Reports
Correction Register
Correction Register
Integration Report
Integration Report
Justification Document
Justification Document
Meeting Record
Meeting Record
Progress Status Record
Progress Status Record
Validation Report
Validation Report
Verification Report
Verification Report
Process Meta Elements
System
System: Defined by Stakeholders Requirements Document
Product
Product: defined in Project Plan
Project Repository
Project Repository: defined in Project Plan
Stateless meta elements
- Implementation Environment: defined in Project Plan
- Disposed System: defined in Project Plan
- Project Repository Backup: defined in Project Plan
- System Elements: defined in Data Model