ISO 29910-5-6-2 SR Activities
SR.1: Initiation

SR.1.1: Revise Project Plan

SR.1.2: Generate SEMP

SR.1.3: Generate Data Model

SR.1.4: Update Implementation Environment

SR.2: Requirements Engineering

SR.2.1: Elicit Requirements

SR.2.2: Verify StRS

SR.2.3: Validate StRS

SR.2.4: Elaborate SysRS and Interfaces

SR.2.5: Elaborate SERS and System Interfaces

SR.2.6: Verify SysRS and SERS

SR.2.7: Validate SysRS

SR.2.8: Update Traceability

SR.2.9: Update IVV

SR.3: Architecture

SR.3.1: Functional Design

SR.3.2: Functional trade-offs

SR.3.3: Physical Design

SR.3.4: Physical trade-offs

SR.3.5: Verify System Design

SR.3.6: Update IVV

SR.3.7: Create System Manual

SR.3.8: Verify System Manual

SR.4: Construction

SR.4.1: Construct Software

SR.4.2: Construct Hardware

SR.4.3: Verify System

SR.4.4: Correct Defects

SR.5: IVV

SR.5.1: Verify IVV plan and procedures

SR.5.2: Integrate System

SR.5.3: Verify System

SR.5.4: Validate System

SR.5.5: Correct Defects

SR.5.6: Document Operation Guide

SR.5.7: Verify Operation Guide

SR.6: Delivery

SR.6.1: Review Product

SR.6.2: Document Maintenance Manual

SR.6.3: Document Training Spec

SR.6.4: V&V Maintenance and Training


SR.6.6: Transition to Manufacturing and support